Drafting of the Modified Execution Project of the Geothermal Heating Districh in Mieres
Service | Proyecto de ejecución de District Heating
Client | Grupo Hunosa
Budget | 1,5 M€
District Heating Geothermal for air conditioning of public buildings and homes in the municipality of Mieres (Asturias).
The installation consists of 3 District Heating circuits whose heat source is mine water at 23 ° C and formed by the following elements: 1 housing heat exchanger and 2,090 kW tubes, 2 1 MW heat pumps, 20 pumps Hydraulics, expansion systems, 7 exchange substations and 2,300 meters of pipe network.
Colectores circuito geotérmico
Colectores del circuito primario geotérmico
Bombas de calor
Bombas de calor en serie y a contraflujo
Detalle instrumentación
Imagen de detalle de contador de energía
Tuberías para District Heating
Detalle de los trabajos de instalación de tuberías para District Heating